The part period procedure adheres to the "classic" lot size formula for the minimum costs whereby variable costs (storage costs) are equal to the lot size independent costs. Starting from the shortage date, successive requirements are grouped together to form lots until the sum of the storage costs equals lot size independent costs. (In other words, this procedure involves an adjustment of quantity-dependent and non-quantity dependent costs.) The following figures are used in the example: Price: $20 Lot size independent rcosts: $100 Storage costs percentage: 10% In the example of the part period procedure above, the best lot size is 2000 pieces because, if more requirements were added to this lot, total storage costs would be larger than the lot size independent costs.
Friday, September 12, 2008
Part Period Procedure Optimum Lot-Sizing Procedures
Labels:
MRP Planning
Subscribe to:
Post Comments (Atom)
Archives
-
▼
2008
(141)
-
▼
September
(20)
- Optimum Lot-Sizing Procedures System Functions in ...
- Part Period Procedure Optimum Lot-Sizing Procedures
- Least Unit Cost Procedure Optimum Lot-Sizing Proce...
- Dynamic Lot Size Creation Optimum Lot-Sizing Proce...
- Groff Reorder Procedure Optimum Lot-Sizing Procedures
- Additional Restrictions Optimum Lot-Sizing Procedures
- Scheduling System Functions in a Planning Run
- Backward Scheduling for External Procurement
- Forward Scheduling for External Procurement
- Creating Order Proposals System Functions in a Pla...
- Determining the Source of Supply for Purchase Requ...
- Determining the Source of Supply for Delivery Sche...
- Supply Source Determination for Retail Order Propo...
- Creation of Exception Messages MM
- Rescheduling Check System Functions in a Planning Run
- Storage Location MRP
- Storage Location MRP with Stock Transfer
- Storage Location MRP with Special Procurement
- Quota Arrangements System Functions in a Planning Run
- MM Multi-Plant Planning with Stock Transfer
-
▼
September
(20)
No comments:
Post a Comment