Rescheduling Check Current Stock/Requirements List

If you want to carry out a rescheduling check from the stock/requirements list, select List ® Rescheduling check. The system then carries out the rescheduling check in exactly the same way as it did for the planning run (see Rescheduling Check).

You receive the result of the rescheduling check in the form of exception messages which are allocated to the MRP material in the case of a rescheduling proposal.