If no historical data exists for materials, which the system can access during the forecast, it is possible to use another material for the forecast. To do this, you must define a so-called reference material for consumption as well as a reference plant, a validity date, and a multiplier.
If you have defined a reference material, the system accesses the historical data of the reference material during the forecast up to the specified validity date. From the validity date, the system then uses the material’s own historical data.
By entering a multiplier, you can define that only a certain percentage of the consumption quantity of the reference material is used for the forecast.
Wednesday, July 9, 2008
Subscribe to:
Post Comments (Atom)
Archives
-
▼
2008
(141)
-
▼
July
(53)
- Forecast Parameters Topics
- Forecast Parameters Overview
- MRP Forecast Parameters Forecast Models
- Model Selection MRP Forecast Parameters
- Manual Model Selection MRP Forecast Parameters
- Automatic Model Selection MRP Forecast Parameters
- Manual Model Selection with Additional System Chec...
- Model Initialization MRP Forecast Parameters
- Ex-Post Forecast MRP Forecast Parameters
- Parameter Optimization MRP Forecast Parameters
- Maintaining MRP Forecast Parameters
- MRP Forecast Parameters: Independent of the Foreca...
- MRP Forecast Parameters: Dependent on the Forecast...
- Creating Historical Data MRP Forecast Parameters
- Creating Forecast Values MRP Forecast Parameters
- MRP Carrying out the Forecast with Reference to An...
- Maintaining Forecasting Parameters Using Profiles ...
- Maintaining Parameters Using Profiles Overview
- Creating a Profile MRP Forecast Parameters
- MRP Forecast Parameters Displaying a Profile
- MRP Forecast Parameters Changing a Profile
- Deleting a Profile MRP Forecast Parameters
- Carrying Out the MRP Forecast
- Carrying Out the Forecast Overview
- Things to Think About Before Carrying out the MRP ...
- MRP Forecast Options
- Carrying Out the Individual MRP Forecast
- Carrying Out the Total MRP Forecast
- Carrying Out the Total MRP Forecast in Background ...
- Calculating the MRP Forecast Values
- Calculating the Safety Stock and the Reorder Level...
- Ex-Post Forecast MRP Forecast Parameters
- Monitoring the Selected MRP Forecast Model
- How Does the System Optimize the Smoothing Factors...
- MRP Forecast Result Index
- Checking the MRP Forecast Result Using a List
- Checking the MRP Forecast Result in Online Mode
- Changing the Forecast Result
- Significance of the Material MRP Forecast for Mate...
- Material MRP Forecast
- Reducing MRP Forecast Requirements
- Effects on Consumption-Based MRP Planning Procedures
- Splitting the MRP Forecast Requirements
- Forecast Formulae Overview
- Model: Moving Average Forecast Formulae
- Model: Weighted Moving Average Forecast Formulae
- Model: First-Order Exponential Smoothing Forecast ...
- Model: Constant Forecast Formulae
- General Formula for First-Order Exponential Smooth...
- Model: Second-Order Exponential Smoothing Forecast...
- Formula for Evaluating the Forecast
- Formula for Calculating the Safety Stock Forecast ...
- Showing posts with label Forecast Formulae. Show a...
-
▼
July
(53)
No comments:
Post a Comment