There are two possibilities for creating planned orders:
Manually
The MRP controller enters a planned order manually. He determines which material is to be procured, the required quantity, the date required, and whether the material is to be procured externally or internally.
Automatically
During the planning run, the system automatically determines the materials to be procured as well as the required quantity and the required date.