Powered By

Free XML Skins for Blogger

Powered by Blogger

Friday, January 9, 2009

Carrying Out the MRP Planning Run Overview

This section provides you with a detailed description of how to carry out material requirements planning in the SAP R/3 System. In the following section, a detailed description is given of:


  • Things to Think About When Carrying Out the Planning Run

  • Options for Carrying Out the Planning Run

The system goes through various procedures for every material that is to be planned in the planning run. These processes are described in the following subjects:


  • Checking the Planning File

  • Calculating Net Requirements

  • Lot Sizing

  • Scheduling

  • Creating Order Proposals

  • Creation of Exception Messages

  • Rescheduling Check

  • Storage Location MRP

  • Quota Arrangements

  • Multi-Plant Planning with Stock Transfer

    No comments:

    Archives